HYDRAULICS – CX130/CX160 SWING Swing Priority 1) A priority circuit assures swing operation when swing and arm is operated at the same time. When operating the swing and arm simultaneously as in bank shaving or bank cutting operation, a priority circuit in the control valve achieves swing priority. Oil flow from pump2 (rear pump) enters the PL port of the control valve and flow from pump1 (front pump) enters the PR port. When swing right or left is activated pilot pressure is sent from the swing shuttle valve to the cut valve at port pi2 of the main control valve. This allows the swing priority valve to remain in the restricted (orifice) position.
Which prioritizes pump2 oil for swing over the arm circuit. During boom up operation pilot pressure is sent to the boom2 spool, which shuts off the open center passage to the arm1 spool. Pilot pressure is routed from the boom up pilot control circuit through the cut valve at port pi1 of the main control valve. This shifts the swing priority valve to the unrestricted position, which assures pump2 oil flow for arm circuit operation. When swing and arm or boom up is operated at the same time, the swing priority valve remains in the restricted (orifice) position. 5 - 22 CX EXCAVATORS