ce t — Boom Lower

HYDRAULICS – CX210/CX240 ATTACHMENT Boom Lower 1) When a built-in anti-drift valve in the control valve is released and boom1 control spool is shifted, the boom can be lowered. 2) A regeneration valve inside the boom1 control spool provides additional speed. 3) Only one pump flow is used. Oil flow from pump2 (rear pump) enters the P2 port of the control valve. When the boom hand control is operated for boom down pilot pressure is directed through the cushion valve to the boom1 control spool of the main control valve. Pilot pressure is also sent to the boom down anti-drift valve. When the anti-drift valve and boom1 control spool is shifted boom down is achieved.

When the boom is raised the spring chamber of the anti-drift valve is “charged” with boom up pressure. This is done through a pilot signal from the cylinder circuit, which passes through the anti-drift pilot valve to the spring chamber of the anti-drift valve. With equal pressure on each side of the valve the spring is able to hold the valve closed. This keeps boom drift through the control spool at a minimum. When lowering the boom a pilot signal from the boom control pilot circuit is also routed to the anti-drift pilot valve. The valve is shifted and allows the “charged” oil in the spring chamber to exit to the return circuit.

Now the anti-drift valve will open and boom lowering is activated. The cylinder return passes through an orifice in the main control spool. This creates backpressure in the circuit. There is a check valve in the spool between the return and supply circuit. If the supply pressure fall below the backpressure in the cylinder return circuit oil can flow to the supply side through the check valve. This protects from cavitation and helps with boom lowering speed. Whenever the boom is lowered part of the pump supply is allowed to bleed off through the open center circuit through an orifice.

This is to turn the pump “0N” more slowly and maintain some negative control pressure to the pump to limit its output. This is to prevent the pressure spike that occurs when the boom starts to lower. 6 - 26 CX EXCAVATORS