ce t — CX210 / CX240

COMPONENT LOCATIONS CONTROL VALVE PORTS CX210 / CX240 2 - 17 CX EXCAVATORS Port Description Port Description B7 Bucket open P3-P4 Option circuit A7 Bucket close T1-T2 Return B8 Boom lower Ps1-Ps2 Neutral de-stroke A8 Boom raise PT Travel pressure switch A6 LH forward travel pH Power boost pilot signal B6 LH reverse travel PA Upper pressure switch A5 Arm (dipper) extend Dr Leak-off return B5 Arm (dipper) retract Pc1 Arm anti-drift B3 RH swing Pc2 Boom anti-drift A3 LH swing T4 By-pass return A2 Option circuit T5 To cushion heat circuit B2 Option circuit T3 Swing return A1 LH forward travel Pc3 Swing priority B1 LH reverse travel Pbu Swing priority cancel P1-P2 Pump pressure P1-P2