International Trucks — International VT 365 Diesel Engine Service Manual 2004-2006

70 ELECTRONICALLY CONTROLLED VARIABLE GEOMETRY TURBOCHARGER (VGT) 18. Remove cap and align the arrow on the inlet duct with the mark on the inlet housing opening on VGT and press on the VGT. 1. During reassembly, lubricate new O-rings with clean engine oil. Make sure O-rings are seated correctly not twisted or distorted. 19. Secure air inlet duct to VGT by tightening hose clamp to the special torque (Table 5). Figure 77 VGT control valve Figure 75 Air inlet duct 2. Install control valve carefully to avoid twisting or cutting O-rings. 1. Lube oil fill extension tube 2. Breather hose 3. Air inlet duct NOTE: Do not use the retaining bolt to draw the control valve into the housing.

Push the VGT control valve in by hand to seat securely before installing bracket and bolt. 20. Remove cap from the valve cover and thread the oil fill extension tube in the valve cover and torque to the special torque (Table 5). Control Valve (If previously removed) Figure 78 Retaining bolt for VGT Control valve 1. VGT control valve bracket 2. Retaining bolt Figure 76 O-ring lubrication EGES295-2 Read all safety instructions in the "Safety Information" section of this manual before doing any procedures. Follow all warnings, cautions, and notes. ©2006 International Truck and Engine Corporation