International Trucks — International VT 365 Diesel Engine Service Manual 2004-2006

MANIFOLDS AND EXHAUST GAS RECIRCULATION (EGR) 87 Figure 113 Intake manifold gasket with centering tab Figure 111 EGR cooler retaining bolts 2. Position a new intake manifold gasket on each side of intake manifold and run two bolts through each side to hold gaskets. Make sure centering tabs are facing up in the manifold, while positioned inboard toward the engine valley. 5. Tighten all three fasteners to the standard torque (Standard Torques, page 375). Intake Manifold and EGR Cooler 3. Remove protective magnetic covers (Table 9) from cylinder head intake ports. Figure 112 Front module seal 1. Install a new front module seal between the intake manifold and front cover module.

Figure 114 Intake manifold and EGR cooler assembly EGES295-2 Read all safety instructions in the "Safety Information" section of this manual before doing any procedures. Follow all warnings, cautions, and notes. ©2006 International Truck and Engine Corporation