. OPERATION MACHINE OPERATIONS AND CONTROLS BUCKET REPLACEMENT WARNING Replacement 1. Place the bucket in contact with a flat surface. (B), and remove the bucket. 3 - 127 Wh en pins are knocked in with a h ammer, pieces of metal may fly and cause serious injury. Wh en carrying out this operation, always wear goggles, hard hat, gloves, and other protective Wh en the bucket is removed, plac If p ins are hit with a strong force, th ere is a hazard that the pin may fly ou t and i njure people in th e surrounding area. M ake sure tha t there is no one in the surroun ding area before starting the operation. Wh en removing the pins, do not sta nd behind the bucket.
In addition, be extremely careful not to put your foot under th e bucket whi le standing at the side for the w ork. be extremely careful not to get your fingers caught. in holes when aligning the holes. Wh en removing or inserting pins, be extremely careful not to get your f ingers Nev er insert your fingers into the p in holes when aligning the holes. Stop the machine on a firm and fl at surface and do the work.
When performing joint wor k, appoint a lead an d follow that p erson's instructions and sig NOTIC E removing the bucket, set the bucket cylinder (3) facing down as When as shown in the diagram in the right to p revent the front link (5) from jumping up un der the weight of the bucket cyl inder (3). REMA RK removing the pins, place the bucket so that it is in light ct with the ground. bucket is lowered strongly to the ground, the resistance will reased and it will be difficult to remove the pins.
When conta If the bucket is lowered strongly t o the ground, the resistanc be inc reased and it will be difficul emove the stopper bolts an d nuts, then remove pins (A ) and NOTIC E After r emoving the pins, make sure th at mud or sand does not get on them. Dust s eals are fitted at both ends of th e bushings, be careful not to damage them.