. OPERATION TRANSPORTATION LIFTING MACHINE WARNING shown in the diagram on the right. 3 - 133 The operator carrying out the lifting operation using a crane mus t be a properly qualified crane ope Never raise the machi Always make sure tha t the wire rope is of ample stren gth for the weight When lifting, keep the When carrying out lifti ng operations, set the lock lever t o the L OCK position to prevent the machine fr om moving unexpectedly.
Never enter the area u nder or around a raised machin Never try to lift the machi ne in any posture other than the posture given in the procedure below or usi ng lifting equipment other than in the procedure bel There is a hazard that the machine may lose its balance. NOTICE plies to the standard specification machine. ers according to the attachments and options installed. This method of lifting ap plies to the standard specificatio n machine The method of lifting diff ers according to the attachment s and options For details of the proced ure for machines that are not the standard specification, please consult your For weight, see "SPE CIFICATIONS (PAGE 5-2)".
When lifting the machi ne, carry out the operation o n flat ground as 1. Lifting machine racke t installed ole of the counterweight and boom foot pin 6 tons t lifting position ∅140 mm (5.5 in) at lifting position ∅63 mm (2.5 in) 2 in) in een centers (horizontal) measurement 3862 center of gravity installed to the machine 2. The mark for the machine condition at lifting position ∅63 mm (2 .5 in)