Komatsu — EVERY 10 HOURS MAINTENANCE

. LOADING SHOVEL MAINTENANCE EVERY 10 HOURS MAINTENANCE LUBRICATTING 7 - 18 1. Set th e work equipment in th e greasing posture belo w, then lower the work e quipmen t to the ground and stop the en gine. 2. Using a grease pump, pump in grease through the g rease fittings sho wn by a 3.

After greasing, wipe off any old grease that was pus (1) Boom cylinder foot pin (2 pla (2) Arm-Bucket coupling pin (2 p (3) Bucke t hinge pin (2 places) (4) Bottom dump cylinder rod en d pin (2 places (5) Bottom dump cylinder foot pi (6) Bucke t cylinder foot pin (2 pl (7) Bucke t cylinder rod end, link connection pin (4 place (8) Boom centralized greasing bl ock (7 places) Boom foot Arm cy Boom Bucke (9) Arm c ylinder rod end (1 place (10