hitachi — REMOVE AND INSTALL MAIN FRAME

UPPERSTRUCTURE / Main Frame Installation CAUTION: Upperstructure (8) weight: 17500 kg (38600 lb) 1. Attach a wire onto upperstructure (8). Adjust chain block (11). Level upperstructure (8). Hoist upperstructure (8) and align with the matching mark on swing bearing (10). 2. Install the knock pins (2 used) into the outer race. Insert and tighten bolt (9) temporarily. Remove the wire rope. Tighten bolt (9). 11 8 W1JB-02-03-008 : 2160 N m (220 kgf m, 1590 lbf ft) 3. Install hoses (6) (6 used) to center joint (5). : 50 mm : 19 mm : 29.5 N m (3 kgf m, 22 lbf ft) : 27 mm : 98 N m (9.5 kgf m, 72 lbf ft) : 41 mm : 205 N m (21 kgf m, 151 lbf ft) 4. Install lock plate (7) to center joint (5).

W1JB-02-03-002 7 : 22 mm 5 6 : 140 N m (14 kgf m, 105 lbf ft) W16J-03-03-002 6 W2-3-4 8 10 9