UPPERSTRUCTURE / Pump Device 30. Install pre-cleaners (3) (2 used) to cover (4) with bolts (1) (8 used) and washers (2) (8 used). 4 3 5 : 50 N m (5 kgf m, 37 lbf ft) 31. Install stay (5) to cover (8) with bolts (6) (4 used) and washers (7) (4 used). : 17 mm 1, 2 : 90 N m (9 kgf m, 66 lbf ft) 32. Install cover (9) to support (16) with bolts (14) (6 used) and washers (15) (6 used). : 19 mm 6, 7 8 : 50 N m (5 kgf m, 37 lbf ft) 33. Install stay (10) to the hole on bracket (13). Secure stay (10) to bracket (13) with washer (11) and lock pin (12). 34. Shut cover (9). : 17 mm W1JB-02-04-010 9 A 9 14, 15 16 W1JB-02-04-020 10 11 12 13 9 W1JB-02-04-021 Detail A W2-4-18