hitachi — REMOVE AND INSTALL CONTROL VALVE

UPPERSTRUCTURE / Control Valve 3. Install all the hoses and pipes to control valve (5). : 17 mm : 24.5 N m (2.5 kgf m, 18 lbf ft) : 19 mm : 29.5 N m (3 kgf m, 22 lbf ft) : 19 mm : 90 N m (9 kgf m, 66 lbf ft) : 41 mm : 205 N m (21 kgf m, 155 lbf ft) : 180 N m (18.5 kgf m, 133 lbf ft) 4. Install covers (2, 4) to main frame (1) with bolts (3) (11 used). : 12 mm : 19 mm : 90 N m (9 kgf m, 66 lbf ft) IMPORTANT: After completing the work, check the oil level. Start the engine and check for any oil leaks. 3 2 4 3 1 W1JB-02-05-001 1 W2-5-4 5 Signal Control Valve 4-Spool Solenoid W1JB-02-05-004 Valve Signal Control Valve 4-Spool Solenoid Valve