hitachi — ASSEMBLE CONTROL VALVE (5-SPOOL HOUSING UPPER AND LOWER SURFACES)

UPPERSTRUCTURE / Control Valve Assemble Boom 2 Anti-Drift Valve 20. Install poppet (67) and spring (68) to housing (64). 21. Install O-rings (78, 81) and backup rings (77, 80) to sleeve (79). Install sleeve (79) to cover (73). 22. Install O-ring (84) to cap (85). Install poppet (82), spring (83) and cap (85) to cover (73). : 50 N m (5.1 kgf m, 37 lbf ft) 23. Install O-ring (75) to cap (74). Install piston (76) and cap (74) to cover (73). : 8 mm : 60 N m (6.1 kgf m, 44 lbf ft) 24. Install O-ring (71) to cap (72). Install check valve (69), spring (70) and cap (72) to cover (73). : 27 mm : 20 N m (2 kgf m, 15 lbf ft) 25.

Install O-rings (65), (66) (2 used) and cover (73) to housing (64) with socket bolts (86) (4 used). : 5 mm : 12 mm : 180 N m (18.3 kgf m, 133 lbf ft)) W2-5-57