UPPERSTRUCTURE / Swing Device Disassemble Swing Device CAUTION: Motor weight: 70 kg (155 lb) 1. Install eyebolt (M10, Pitch: 1.5 mm) to motor (1). Put the matching marks on the mating surface of motor (1), ring gears (2, 3) and housing (22). Remove bolts (20) (12 used). Remove motor (1) from ring gear (2). CAUTION: The second stage carrier (8) assembly weight: 44 kg (97 lb) 6. Attach a nylon sling onto second stage carrier (8). Hoist and remove second stage carrier (8). : 30 mm CAUTION: Ring gear (3) weight: 32 kg (71 lb) 7. Remove ring gear (3) from housing (22). Eyebolt Mounting Position NOTE:
Insert a screwdriver into clearance between ring gears (3) and housing (22), and float ring gear (3). 8. Remove retaining ring (9) from shaft (34). CAUTION: Housing (22)+shaft (34)+others weight: 265 kg (585 lb) 9. Fasten the housing (22) body by using a nylon sling. Place housing (22) with the motor mounting side facing downward. 10. Remove socket bolts (28) (10 used). Remove cover (27) from housing (22). Remove O-Ring (26) from housing (22). W162-02-05-010 2. Remove plug (23). Remove cock (24) and drain off oil. : 14 mm CAUTION: Ring gear (2) weight: 23 kg (51 lb) 3. Remove first stage sun gear (4). Remove ring gear (2) from ring gear (3). : 10 mm CAUTION:
Housing (22) + shaft (34) +others weight: 260 kg(575 lb) 11. Fasten the housing (22) body by using a nylon sling. Place housing (22) with the motor mounting side facing upward. NOTE: Insert a screwdriver into clearance between ring gears (2, 3) and float ring gear (2). CAUTION: The first stage carrier (6) assembly weight: 24 kg (53 lb) 4. Remove the first stage carrier (6) assembly. 5. Remove second stage sun gear (7) from second stage carrier (8). W2-6-5