hitachi — DISASSEMBLE SWING DEVICE

UPPERSTRUCTURE / Swing Device 20. Remove spring pin (13) from first stage carrier (6) by using a round bar and hammer. Round bar ( φ 5.0 mm, Length: 50 mm or longer) 21. Remove pins (18) (3 used), first stage planetary gears (17) (3 used), thrust plates (15) (6 used) and needle bearings (16) (3 used) from first stage carrier (6). 22. Remove thrust plate (5) from first stage carrier (6). 23. Disassemble the second stage carrier (8) assembly in the procedures as steps 20 to 22. CAUTION: When pushing shaft (34) by using a press inside the guide. 14. Set shaft (34) with special tool to a press stand. Press 34 25 32 Guide NOTE: The needle bearing is not used for second stage planetary gear (12).

W157-02-06-014 CAUTION: Shaft (34) + bearing (25) + others weight: 100 kg (220 lb) 15. Remove bearing (25) from shaft (34) by using a press. 16. Remove sleeve (32) from shaft (34). Remove O-ring (33), screws (30) (4 used) and magnets (31) (4 used) from sleeve (32). 17. Remove oil seal (29) from cover (27). 18. Fasten the housing (22) body by using a nylon sling. Turn over housing (22). 19. Remove bearing (10) from housing (22). W2-6-9