UPPERSTRUCTURE / Swing Device 17. Install retaining ring (9) to shaft (34). 24. Install cocks (24) (2 used) to housing (22). Face the handle of cock (24) and close the port hole. CAUTION: The second stage carrier (8) assembly weight: 44 kg (97 lb) 18. Attach a nylon sling onto the second stage carrier (8) assembly. Hoist and install the second stage carrier (8) assembly to housing (22). NOTE: As for the positions of cock (24) and plug (23), refer to W2-6-4. 25. Install plug (23) to cock (24). : 14 mm : 30 N m (3 kgf m, 22 lbf ft) 26. Add gear oil. Gear oil: 15 L (4 US gal.) CAUTION: Ring gear (3) weight: 32 kg (71 lb) IMPORTANT:
Apply THREEBOND #1215 onto the ring gear (3) mounting surface on housing (22). 19. Hoist and install ring gear (3) to housing (22) while aligning the matching marks made when disassembling. 20. Install second stage sun gear (7) to second stage carrier (8). CAUTION: Motor (1) weight: 70 kg (155 lb) 27. Install eyebolt (M10, Pitch: 1.5 mm) to motor (1). Hoist and install motor (1) to the swing reduction gear assembly with bolts (20) (12 used) and spring washers (19) (12 used). : 30 mm : 400 N m (41 kgf m, 295 lbf ft) CAUTION: The first stage carrier (6) assembly weight: 24 kg (53 lb) 21. Attach a nylon sling onto the first stage carrier (6) assembly.
Hoist and install the first stage carrier (6) assembly to second stage carrier (8). IMPORTANT: Install first stage sun gear (4) with the step end facing downward (thrust plate side). 22. Install first stage sun gear (4) to first stage carrier (6). Eyebolt Mounting Position CAUTION: Ring gear (2) weight: 23 kg (51 lb) IMPORTANT: Apply THREEBOND #1215 to the ring gear (2) mounting surface on ring gear (3). 23. Hoist and install ring gear (2) to ring gear (3) while aligning the matching marks made when disassembling. W162-02-05-010 W2-6-13