UPPERSTRUCTURE / Engine 9. Install the hose, pipe and connector to the pump device. (Refer to the Remove and Install Pump Device group on W2-4-1.) 10. Install hoses (106) (2 used) to engine (77). N W1JB-02-14-007 M : 41 mm 106 77 : 205 N m (21 kgf m, 150 lbf ft) 11. Install wirings (106) (2 used) to starter motor (102) with nuts (101) (2 used). W1JB-02-14-021 View N 101 102 : 8 mm : 5 N m (0.5 kgf m, 3.7 lbf ft) : 17 mm : 20 N m (2 kgf m, 15 lbf ft) 12. Install the ground line to starter motor (102) with nut (103) and washer (104). 103, 104 85 : 22 mm 105 : 55 N m (5.5 kgf m, 40 lbf ft) 13. Install connectors (23) (5 used). 14.
Install clamps (25) (4 used) to main frame (12) with sems bolts (24)(4 used). 12 W1JB-02-14-018 Detail for Position M 106 24 86 : 17 mm : 50 N m (5 kgf m, 37 lbf ft) 12 W1JB-02-14-011 W2-14-13 23 24 23 25