hitachi — DISASSEMBLE TRAVEL DEVICE

UNDERCARRIAGE / Travel Device CAUTION: Cover (47) weight: 40 kg (90 lb) 4. Put the matching marks on the mating positions of cover (47) and ring gear (43). Install eyebolt (M12, Pitch 1.75 mm) into the cork hole (2 places) on cover (47). Remove bolts (49) (18 used) and spring washers (48) (18 used). Hoist and remove cover (47) from ring gear (43). CAUTION: Ring gear (43) weight: 130 kg (290 lb) 7. Put the matching marks on the mating positions of ring gear (43) and drum (10). Remove socket bolts (44) (30 used). Install eyebolt (M14, Pitch 2.0 mm) into the bolt (49) hole (2 places) on ring gear (43). Hoist and remove ring gear (43). Remove O-ring (12) from drum (10). : 22 mm NOTE:

THREEBOND #1215 has been applied on the mating surfaces between ring gear (43) and cover (47). Install the bolt into the cork hole on cover (47) (34 mm or deeper). Float and remove cover (47). : 17 mm NOTE: LOCTITE #262 has been applied to socket bolt (44). NOTE: Do not remove stopper pin (45) and bearing (46) attached with cover (47) unless damage and wear are found. CAUTION: The first stage carrier (31) assembly weight: 30 kg (70 lb) 5. Remove shaft (42) from first stage carrier (31). Attach a nylon sling onto first stage carrier assembly (25 to 31). Hoist and remove first stage carrier assembly (25 to 31) from second stage carrier (22).

Remove second stage sun gear (24) from second stage carrier (22). CAUTION: The second stage carrier (22) assembly weight: 50 kg (110 lb) 6. Attach a nylon sling onto second stage carrier (22). Hoist and remove second stage carrier assembly (22, 23, 32 to 36) from ring gear (43). Remove third stage sun gear (21). W3-2-7