Hitachi Construction Machinery — DISASSEMBLE TRAVEL DEVICE

UNDERCARRIAGE / Travel Device CAUTION: The third stage carrier (19) assembly weight: 130 kg (290 lb) 8. Attach a nylon sling to third stage carrier (19). Hoist and remove third stage carrier (19) assembly (19, 20, 37 to 41). 9. Remove bolts (15) (2 used). Remove lock plate (14) from bearing nut (13). CAUTION: Drum (10), sprocket (16) and others weight: 350 kg (770 lb) 11. Secure housing (5) onto the workbench tightly. Install eyebolt (M22, Pitch 2.5 mm) into the bolt (44) hole (2 places) on drum (10). Hoist and remove the drum (10) assembly from housing (5). At this time, the inner race of roller bearing (7) is removed together. 12.

Remove the inner race of roller bearing (11) from drum (10). Attach a nylon sling to sprocket (16). Turn over the drum (10) assembly. 13. Remove floating seal (6) at one side from housing (5). 14. Remove floating seal (6) at other side from support (9). : 19 mm NOTE: LOCTITE #262 has been applied to bolt (15). 10. Install special tool (ST 3140) to bearing nut (13). Remove bearing nut (13) from housing (5). W800-03-02-003 IMPORTANT: The housing (5) contacting surface on support (9) is the sliding surface. Place the drum (10) assembly onto the wooden block in order not to damage the sliding surface. W3-2-9 ST 3140