UNDERCARRIAGE / Travel Device IMPORTANT: There is an identification groove on the end of third stage planetary gear (38). Install third stage planetary gear (38) with the identification groove facing to the cover (47) side. 19. Install needle bearings (41) (4 used) to third stage planetary gears (38) (4 used). Clamp third stage planetary gear (38) with thrust plates (37) (8 used). Install third stage planetary gear (38) to third stage carrier (19). 20. Apply grease onto pins (40) (4 used). Align with the pin (39) hole on third stage carrier (19) and install pins (40) (4 used). IMPORTANT: Install spring pin (39) with the slit facing to the pin (40) end. 21.
Tap and install spring pins (39) (4 used) into third stage carrier (19) and pin (40) by using a round bar (Dia.: 8 mm (0.3 in)). IMPORTANT: Install spring pin (29) with the slit facing to the pin (27) end. 24. Apply hydraulic oil to pin (27). Align with the spring pin (29) hole on first stage carrier (31) and install pins (27) (3 used). Tap and install spring pins (29) (3 used) into first stage carrier (31) and pin (27) by using a round bar (Dia.: 4 mm (0.2 in)). 29 27 Slit W178-02-06-002 25. Assemble second stage carrier (22) according to steps 22 to 24. Round Bar Dia.: 5 mm (0.2 in) 39 40 CAUTION: The third stage carrier (19) assembly weight: 130 kg (290 lb) 26.
Attach a nylon sling onto third stage carrier (19) assembly (19, 20, 37 to 41). Hoist and place the third stage carrier (19) assembly onto housing (5). Slit W178-02-06-002 22. Install spacer (30) to first stage carrier (31). 23. Install needle bearing (26) to first stage planetary gear (28). Clamp first stage planetary gear (28) with thrust plates (25) (2 used). Install first stage planetary gear (28) to first stage carrier (31). Install other first stage planetary gears (28) (2 used) in the same procedures. CAUTION: Ring gear (43) weight: 130 kg (290 lb) IMPORTANT: Engage the spline of ring gear (43) with third stage planetary gears (38) (4 used).
Align the matching marks on drum (10) and ring gear (43). 27. Apply grease to O-ring (12). Install O-ring (12) to drum (10). Install eyebolt (M14, Pitch 2.0 mm) into the bolt (49) hole (2 places) on ring gear (43). Attach a nylon sling onto ring gear (43). Hoist and place ring gear (43) onto drum (10). W3-2-17