UNDERCARRIAGE / Track 15. Remove special tool (ST 1532) when removing and installing master pin and a chain block from track link (6). IMPORTANT: After raise the machine, support the machine by using a block securely. 16. Turn the upperstructure 90 ° to the direction to remove the track. Set the angle between boom and arm in 90 ° to 110 ° and lower the bucket onto the ground. Raise the machine and support the machine by using a block. 90° to 110° CAUTION: The track assembly weight: 4080 kg (9000 lb) 17. Turn the travel device to the reverse direction and extend the track. W800-03-07-003 Block W105-03-07-011 W3-7-7 Chain Bloc Chain Bloc k ST 1532 Travel Device Travel Device