FRONT ATTACHMENT / Front Attachment Installation CAUTION: The arm (3) assembly weight: Standard 3.7 m arm: 4300 kg (9480 lb) H 3.7 m arm: 4510 kg (9940 lb) BE 2.9 m arm: 4650 kg (10250 lb) 1. Install the shackles (2 used) to the arm (3) as- sembly. Hoist the arm (3) assembly. Travel the machine forward and align the pin (14) hole on boom (2) with that on arm (3). 2. Install thrust plates (17) into left and right sides of arm (3) respectively. Thrust plate (17) thickness: 8.0 mm (0.3 in) 3. Insert the shims between arm (3) and thrust plate (17). Adjust clearance a to arm (3) within 1.5 mm (0.06 in). Shim thickness:
1.0 or 2.0 mm (0.04 or 0.08 in) 3 2 Hole for Pin (14) W1J7-04-01-013 2 2 17 15 CAUTION: Metal fragments may fly off when a hammer is used. Wear necessary protection, such as goggles, hard hats, etc in order to prevent personal injury. 16 14 CAUTION: Pin (14) weight: 110 kg (240 Ib) 4. Attach a nylon sling onto pin (14) and hoist pin (14). Install pin (14) into boom (2). Install stopper (15) to pin (14) with bolts (16) (3 used). W1JB-04-01-012 17 3 a : 30 mm : 400 N m (40 kgf m, 295 lbf ft) W4-1-9