hitachi — REMOVE AND INSTALL COUNTERWEIGHT

UPPERSTRUCTURE / Counterweight Installation CAUTION: Counterweight (4) weight: Approx. 9150 kg (20200 lb) CAUTION: Do not stay under the lifted counterweight. 1. Install the shackle and wire rope to the lifting bracket on the top of counterweight (4). Hoist counterweight (4).Insert the protrusion part on counterweight (4) into the hole on main frame (2) and install counterweight (4). 5 4 10 9 8 7 6 1112 2 CAUTION: When using a power wrench, do not injure hands by the reaction bar. W1JB-02-02-001 IMPORTANT: Apply lubricant to bolt (15) and install bolt (15). Install shim (5) with the collar facing downward. 2.

Install bolts (15) (2 used), nuts (7) (2 used), shims (5) (2 used) and washers (6, 14) (2 used for each). Tighten bolts (15) (2 used) by using a power wrench. 4 11, 12, 13 10 14 8, 9 15 : 65 mm : 3400 N m (347 kgf m, 2510 lbf ft) 3. Install shims (12) (2 used), (13) (4 used), spacers (11) (2 used), stoppers (10) (2 used), spring washers (9) (4 used) and bolts (8) (4 used). Remove the wire rope and shackle. W1JB-02-02-002 2 : 36 mm : 700 N m (71 kgf m, 520 lbf ft) NOTE: In case there is clearance between spacer (11) and main frame (2), install shims (12, 13). W2-2-3 2 13 14 15 5 6 7