. OPERATION TROUBLES AND ACTIONS TOWING THE MACHINE WARNING LIGHTWEIGHT TOWING HOLE (No-blade specification) WARNING objects. 3 - 122 When towi ng the machine, use a wire ro pe that ha s ample strength for the w eight of the machine that Do not app ly a sudden load to the wire r If the machin e cannot get out of mud u nder its o wn power , or if it is towing a hea vy object, use wir e ropes as show n in the diagram on the right and tow the machine Put wooden blocks between prevent dam age to the ropes When doing specification The shackl e must always be u sed. Hold the ro pe level and direct i t straight to the tra ck frame Move the m achine slowly in th e Lo mode .
There is a ho le in the track fram e to fit th e shackl e when towing l ight Permitted to wing capacity: Ma x. 34,32 0 N (3,5 00 kgf) SEVERE JOB CONDITIO N When car rying out digging operation s in wate r, if the work e quipment mounting pin goes int o the water, carry out greasing every time the op eration is carried out. For heavy -duty operations and deep digging, carry o ut greasing of th e work equipment mou nting pins every time before op eration. After greasin g, operate the bo om, arm, bucket, and blade (machine equipped with blade) sever al times, then grease again.