. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER HM total 6 - 13 ESTIMATE DISPLAY When the load changes each bucket bucket is l oaded, an d flashes the appropriate lam p to prevent overloading. The predic ted load d isplay an d actual payload dis play are shown at the same time payload if one more Example: expected number o f bucke 1st bucke t 7 tons 2nd bucke t 7 ton s (total: 1 4 tons) 3rd bucke t 7 tons (total: 21 tons) tons) tons) 4th bucke t 7 tons (total: 28 5th bucke t 7 tons (total: 35 When the machine i s loaded in this w ay, t he exte rnal display lamps light up as s hown in the chart below.
NOTICE I f the red la mp flashes, and the sa me load as in the last bucket is loaded, the total load wil l exceed 105%. I f the red la mp flashes and the yel low lam p also lights u p, do not load anything. I f the red la mp flashes and the yel low lam p also flashes , load half a bucket. REMARK It is possible t o change t he lightin g-up conditions of th e lamp b y operatin g the switch of the payloa d meter controller. Please consu lt your Komatsu dis tributor before mak ing any c hanges.