Komatsu — OPERATION OF SWITCHES

. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER HM CARRYING OUT CALIBRATION WHEN CARRYING OUT CALIBRATION 6 - 18 NOTICE Carry ou t calibra tion in th e following When the mac hine is d elivered, a nd at eac h change of s easo When the sus pension cylinder ga s pressu re and oil has bee n adjusted (When t he suspensio n has bee n adjusted.

When the mac hine has been modified and the unloaded weight of the machine has changed more than 100 kg (22 1 lb When the sus pension pressure s ensor ha s been replaced When any oth er chang e has been made ar ound t he When there is a difference b etwee n the co ndition of the machine r ecognized by the payload m eter a nd t he actual c ondition of the d ump truc k. For d etails, see Section " DISPLAY DURING NORMAL OPERATIONS (PAGE 6 -11)". PREPARATIONS BEFORE CARRYING OUT CALIBRATIO Che ck that t he leng th of the s uspens ion is within the p rope r range.

Fo r details, se e Section "CHECK LENGTH OF SUSPENSION CYLINDE R (PAG E 4-31)" Whe n carryi ng out c alibration , use a f lat, straight road with no uneven places. ( Distanc e: approx. 120 m (393 ft 8 in) Carr y out th e check s with the machin e unloaded. Be sure to completel y remove all the s oil r emaining inside the dum p body.