. MAINTENANCE MAINTENANCE PROCEDURE EVERY 100 HOURS MAINTENANCE LUBRICATING 4 - 41 NOTICE I f any ab normal noise is g enerated from any gr easing poin t, carr y out g reasing regardless of t he greasing interval. C arry ou t greasing every 1 0 hours for th e first 5 0 hours on a new machine. A fter the machine was sub jected to jobs in the water, be su re to grease the wet 1. osture right, lower the work equipm ent to the ground, then stop t he engine. 2. Using a grease pump rease fitting s shown by arro 3.
After greasing, wipe o ff any old grease th at was pu shed (1) Arm-L ink coupling pin (1 place) (2) Arm - Bucket connecti on pin (1 place) (3) Link c oupling pin (2 pla (4) Bucke t cylinder rod pin (5) Bucket-Link coupling p