Komatsu — Komatsu PC308USLC-3E0 Hydraulic Excavator Operation & Maintenance Manual

. MAINTENANCE MAINTENANCE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING carried out. down 4 - 66 The a ccumulator is charged wi th high-pressure nitrogen gas, so mistaken operation may cause an exp losion, which will lead to seriou s injury or damage. Whe n handling the accumulator, alway s do as follows Th e pressure in the hydraul ic circuit cannot be completely re moved. When removing the hydraulic equipment, do not stand he direction that the oil s purts out when carrying out the op eration. In addition, loosen the bolts slowly when carrying out operation.

Do not disassemble the acc Do not bring it near flame o Do not make holes in it or w Do not hit it, roll it, or subje Wh en disposing of the acc umulator, the gas must be release d. Please contact your Komatsu distr ibutor to have this work NOTIC E If the nitrogen gas charge pres sure in the accumulator is low and operations are continued, it will beco me impossible to release the re maining pressure inside the hydraulic circuit if a failure occ urs on the machine.

FUNCTION OF ACCUMUL ATOR e pressure in the control circui The a ccumulator stores th after the engine is stopped, the control circuit can be oper the fo If t eq llowing actions are po he control lever is ope uipment, it is possibl ssible. rated in the direction to lower t e for the work equipment to g un Th der its own weight. e pressure in the hyd raulic circuit can be released. The a ccumulator is installe on th e right.