Dry Fertilizer Attachment Pull down on chain tightener (A) and secure with retaining hook. Remove chain (B) from driver and driven sprockets. Remove rubber sprocket spacers (C). Slide desired driver and driven sprockets into alignment with chain tightener and replace chain. Replace rubber sprocket spacers required. IMPORTANT: between sprockets as Be certain sprockets are aligned properly with chain tightener and secured with rubber spacers. Check to be sure chain runs freely on selected sprockets; improper alignment can cause drive failures. Repeat the procedure for the fertilizer drive on the opposite side of the planter.
Because the dry fertilizer attachment meters volume B21,7AT,B -19-28JUN90 B21,7AT,C -19-28JUN90 and not weight, and because of the differences between the many brands, analysis of fertilizer, temperature and humidity, the weight metered out can vary as much as 100 per cent from the weight calculated in the fertilizer rate chart. 9 5.3 180790