Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE REPLACE AIR CONDITIONER BELT to the side. 2. Replace the V-belt. When adjusting the V-belt, do not push the compressor directly with the bar. Use jack bolt (2). The deflection of when the belt is 6 kg (58.8 N). 4 - 38 1. Loosen 2 bolts (1) and jack bolt (2), the n mov e compressor (3) 2) and bolt (1) to appl the bolt should be a y tension pprox. 10 to the mm V-belt. (0.4 in) the air pressed at the midpoint between the y and fan pulley with a finge r force of approx.

new part, it will stret ch at f irst, so adjust the without fail after 2 or 3 day GREASE DOOR HI NGE ith cab) (Machine equipped w If the door makes a s queaking noise when it is o pened or closed, spray lubricant in thro ugh the split in the hi nge b ushing. If the bushing is worn , replace the hinge. CHECK DOOR LO CK STRIKER ith cab) or of lock striker exceeds 0.5 mm (0.02 in), (Machine equipped w If wear (A) of the do in), replace the striker. If i t is used as it is, the pl ay will increase and this may result in breakag e of the hinge or doo r lock.