Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE the ON start. 4 - 38 4. Operate position . Lamp (4) will flash and th e electric p riming p REMARK tric priming pump switch has a built-in timer, and this actuates and stops the pump automatically. e lamp is flashing, the electric priming pump will stop, but this does not indicate any abnormality.

The elec tric primin g pump switch h as a built-in timer, a nd this a ctuates and stops th e pump automatica While th e lamp is f lashing, the elec tric priming pump wi ll stop, b ut this does not indic ate any abnormalit If the swi tch is turn ed to the OFF po sition when the lamp is lighte d up, the lamp will go out and the electric priming pump wi ll stop. 5. When t he specifi ed time (approx. 7 minutes) has passed, lamp (4) automatically goes out and the electric ps. electric priming pump sto 6.

If the fu el has bee n drained from t he fuel circuit, such as when the engine has run out of fuel and stop ped, or maintenance has been carried ou t on the fuel hoses o r tubes, or the supply pump h as been replaced, t urn the switch f or the elec tric priming pum p to the ON position again aft er the electric priming pump stops automatically (lamp g oes out). es out, the air bleed operation is completed. 7. When t he lamp go es out, the air b leed operation is co mpleted.