3) Temporarily tighten six nuts ⑤ for injection pump. The final screwing down of injection pump nuts is conducted after rear bracket bolt(s) of the injection pump is (are) tightened. 4) Install rear bracket ⑥ of injection pump and rear bracket bolt ⑦ on the cylinder block. 5) Mount rear bracket bolt ⑧ to injection pump bracket ⑨ . Do not screw down those bolts. Rear bracket bolt ⑦ and ⑦ will be tightened to the specified torque after the injection pump nuts are tightened. 6) Tighten the injection pump nuts to the specified torque. N·m 25 7) Screw down injection pump bracket bolt(s) to the specified torque. N·m 25 11. Idler gear 1) Apply some oil to the idler gear and its shaft.
The oil hole in idler gear shaft must be toward upward. 2) Arrange idler gear marks “X”and “Y”so that they both face the engine forepart. 142