TRANSPORTATION OPERATION TRANSPORTATION When transporting the machine, observe all related laws and regulations, and be careful to assure safety. TRANSPORTATION PROCEDURE Transport the machine on a trailer, as a rule. Select a trailer according to the mass and dimensions of the machine shown in "SPECIFICATIONS (PAGE 5-2)". Note that the mass and dimensions for transportation shown in SPECIFICATIONS depend on the types of the shoe, blade, etc. PRECAUTIONS WHEN REMOVING WORK EQUIPMENT POWER ANGLE, POWER TILTDOZER (For D61PX) 1. Lower the blade to the ground and set it horizontal to the ground surface. 2. Remove the brade assembly.
REMARK If the blade of D61EX is angled, its width is shorted to less than 3.0m (9ft 10in). Accordingly, the blade of D61EX does not need to be removed. POWER TILTDOZER If there is any pressure remaining in the tilt piping after the work equipment has been removed, it may be difficult to remove the quick coupler of the tilt hose, so remove the work equipment as follows. 1. Lower the blade to the ground and set it horizontal to the ground surface. REMARK If the blade is tiled, the tilt piping will be under internal pressure, so set the blade horizontal to the ground. 3-88