TRANSPORTATION OPERATION 1) Put blocks in front and behind the track shoes of both sides. 2) Set up chain or wire, following (A) or (B). G A: Set up chain or wire through the holes of track links. G B: Set up chain or wire around the track shoes. 3) Protect the wire from contacting directly with angular parts of the machine, by inserting pads. 3-92