Komatsu — 23.1 MAINTENANCE SCHEDULE CHART

23.

MAINTENANCE SCHEDULE CHART 23.1 MAINTENANCE SCHEDULE CHART SERVICE ITEM PAGE INITIAL 250 HOURS SERVICE (only after the first 250 hours) Replace fuel filter cartridge 3-62 Change oil in engine oil pan, replace engine oil filter catridge 3-58 Check engine valve clearance, adjust 3-7 3 WHEN REQUIRED Check, clean and replace air cleaner element 3-24 Clean inside of cooling system 3-26 Check and tighten track shoe bolts 3-34 Check and adjust track tension 3-35 Check electrical intake air heater 3-37 Replace bucket side cutters 3-38 Replace bucket teeth 3-38 Adjust bucket clearance 3-43 Check window washer fluid level, add fluid 3-44 Check and adjust air conditioner 3-45 CHECK BEFORE STARTING Check coolant level, add coolant 3-47 Check oil level in engine oil pan, add oil 3-47 Check fuel level, add fuel 3-48 Check oil level in hydraulic tank, add oil 3-49 Check air cleaner for clogging 3-49 Check electric wirings 3-50 Check function of horn 3-50 Check for water and sediment in water separator, drain water (option) 3-50 EVERY 50 HOURS SERVICE Lubricating 3-51 Boom cylinder foot pin (2 points) 3-52 Boom foot pin (2 points) 3-52 Arm-Link coupling pin (1 point) 3-52 Arm-Bucket coupling pin (1 point) 3-52 Link coupling pin (2 points) 3-52 Bucket cylinder rod end (1 point) 3-52 Bucket-Link coupling pin (1 point) 3-52 PC450-ENG 3-20