Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 9. After replacing the element, push the dust indicator button to CHECK ELECTRICAL INTAKE AIR HEATER in the 4 - 27 yellow piston will r eturn to its origin al positio Check before the cold season start s (once a year). Remove the elec tric heater from th e engine intake manifold and check for wire disconnect ions and dirt clinging to it. When checking a nd installing the e lectric he ater, re place its gasket CHECK AND ADJUST TRACK TENS ION The wear of pins and bushings on th e undercarriage will vary with th e working conditions an d types of soil.

It is thus necessary to con tinually inspect th e track te nsion s o as to m aintain the standard tension. obsites where the track Carry out the ch eck and adjustme nt under the sam e conditi ons as becomes clogge d with mud, measu re with t he track clogged INSPECTION e on level ground (stop with the transmissi Stop the machin ansmissi FORWARD witho ut applying the br ake). Th en place a straigh on the track shoe s between the carrier roller and the i dler as sh in the figure, and grouser at the mi measure the clearance be dpoint. If the clearance (A) e bar an 30 mm ( to 1.18 in), the te nsion is standard. If the track tensi following manner