Electronic control fuel injection system (Common rail type) 1E-85 How to use breaker box Important: When inspecting or measuring the voltage and continuity of ECM, be sure to use a adapter harness which is appropriate to the breaker box and the inspected machine Before inspection and measurement of ECM are performed, confirm the pin position. Otherwise the ECM may get damaged. Breaker box inspection procedure The breaker box is a tool to easily check open or short circuit in connector pin and harness between ECM and each sensor or actuator, which used to be difficult to check. Voltage and continuity on pins of ECM can be measured through breaker box using digital multi-meter (5-8840-2691-0).
If a scan tool is also used, more precise inspection and service can be performed. Note: The pin No. of ECM in diagnostic procedure matches with the pin No. of breaker box. A 1 2 B C TSWG0049 Name 1. Breaker box 2. Adapter harness How to connect breaker box Caution: Be sure to turn off the key switch before the connectors are disconnected. 1. Disconnect the ECM connector from ECM. 2. Connect the connector of adapter harness to ECM. 3. Connect the ECM connector to adapter harness. 4. Connect the adapter harness to breaker box.