Komatsu — 3.13.5 DIGGING METHOD

USING THE WORK EQUIPMENT 3.13.5 DIGGING METHOD 1 - At the beginning of work, keep the bucket at the correct penetration angle. 2 - Once the desired digging depth has been reached, position the bucket with its back parallel to bottom of the excavation and then start filling. 3 - During the collection phase, make the bucket and the arm move simultaneously; combined movements facili- tate the filling of the bucket and therefore increase productivity. 4 - The removal depth must be correct and suitable for the type of ground; an excessive digging depth may cause the locking of the movements due to the overloading of the engine and pump, and therefore slow down the digging operations.

5 - To dump material on heaps, unload the bucket as soon as it gets near the dumping area; the inertia resulting from the movement will ensure the compaction of the material with no need to use the bucket for this purpose, which avoids impacts and vibrations that facilitate the wear of pins and bushings. 1 RWA22930 RWA37540 CORRECT The bucket starts digging with a slight pe- netration angle. 2 RWA37550 RWA22940 3 INCORRECT If the penetration angle is too wide, the bucket is thrusted downwards, slowing down the digging work DIGGING METHOD CORRECT DIGGING METHOD RWA37560 (Sequence 1 - 2 - 3) 134