. OPERATION DETAILED CONTROLS AND GAUGES wiring installed in the to protect electrical the same way as an 3 - 105 FUSIBLE LIN If any of the follo wing problem s have occurred, th ere is probabl y a disconnection in the fusible lin k.
Ope n the b attery inspectio n cover on th e left side o f the machin e, and check and re If t he starting motor does n ot turn even w hen th e starting switch turned to the STAR connection he battery i in the fusible s discharged link (1 , there i e fusible link In cold weath HEAT sition and p reheating is carried out, b ut the e ngine is difficult start, there is probably a disconnectio n in fu sible link ( REMA A fus ge-size high w portion of the circuit components an ordin No. Capacity Circuit name C onnector No. Part No. (1) 45A Permanent power supply F02 20T-06-81230 (1) 45A Permanent power supply F03 (2) 50A Alternator (35A) F05 417-06-22610 (3) 120A Preheating F06 421-06-22830