Komatsu — BEFORE STARTING ENGINE

. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS 3 - 121 2. Put a container unde r drain h ose (4) t o catch drain ed fuel 3. Loosen plu g (5) to d rain water If water is n flats: Then As s 14 m wate oon completely Tightening drained, torque: 1. screw in 5 - 2.5 N water dr m (0.15 ain pl - 0.25 ug (5). kgm, 1 6. In case air insta ll it no Tightening torque: 8 Close pump room d .0 - 12.0 oor (3) on Nm (0.8 the righ - 1.2 t side kgm, 5 of the .8 - 8.7 lbft) machine. 8. After completing the water dra in operation, bleed the air. Use the same procedure as when replacing the fuel filter cartri For t he air bleeding procedure , see " Procedure fo r Bleeding Air