Structure Structure (3) 1 2 4 3 9A 8 8A 9 6 5 7 7A 5A WLACC03 1 Body 2 Hydraulic cap 3 Gas cap 4 Piston 5 V-O-ring 5A V-O-ring back-up washers 6 Piston ring (piston) 7 O-ring 7A O-ring back-up washer 8 Gas valve 8A Gas valve O-ring 9 Gas valve guard 9A Screw 2) REMOVE FROM HYDRAULIC SYSTEM 2) REMOVE FROM HYDRAULIC SYSTEM Attention Attention 1) Before carrying out any maintenance work the accumulators must be unloaded (zero pressure). B 2) For this, loosen the nut (4) and bolt (B) counterclockwise with 10 mm spanner. The accumulator will be unloaded (zero pressure) in less than a minute. A 侍 3) The lifting system must firstly be secured against lowering.
4) After carrying out maintenance work, screw the bolt (B) and nut (A). 余 Tightening torque A : 2.04 kgf 余 m (14.8 lbf 余 ft ) Ride control valve 7609A6WE28 6-41 6-39-2