Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE Thread diameter of bolt to tighten Work equipment Straight tilt dozer Straight tilt power pitch dozer Sigma dozer Sigma power pitch dozer Angle dozer 24 (Shim part No.: 14Y-71-22280) 27 (Shim part No.:

14X-71-51460) Power angle power tilt dozer 4 - 44 PROCEDURE FOR BLEEDING AIR IN HYDRAULIC SYSTEM See "STARTING ENGINE Since the engine must be started and the blade mu st be ope rated, see O NOTICE If the engine is run at high spe ed immediately after startup o r a cylind er is pushed up to its stroke en d, air take n inside the cylinder may cause damage to the pist 1) Run the engine at l ow idle, and extend a nd r etract ea ch cylinder 4 to 5 times, ta king care that a cylinder is not moved to the e nd of its stroke. (Stop the cylinder approximatel y 100 mm (3. 9 in) short of its stroke end) 2) Next, operate each cylinder 3 to 4 times to t he end o f its stroke.

3) Finally, operate ea ch cylinder 4 to 5 times to the end of its stroke t o completely remove t he air. INSTALLATION OF TR UNNION CAP ent to the ground. 1. 2. 3. 4. 1. Lower the work equipm 2. After setting the work e quipment lock lever to th e LOCK position and stop the engi 3. Install the shims. (Top, bottom: 2 places) ims: Thickness 1mm x 10 n until they reach the specified torque. Standard number of sh ims: Thickness 1mm x 1 4. Tighten bolts (1) in tur n until they reach the specified tor