Komatsu — EVERY 1000 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE CHANGE OIL IN POWER TRAIN CASE, CLEAN STRAINERS (POWER TRAIN PUMP STRAINER, SCAVENGING PUMP STRAINER) WARNING the machine body. 4 - 74 The o il is a t high t emperature immediately a fter the m achine h as been operated. Wait for the oil to cool down b efore st arting the o peration. The u ndercover is heavy. Never try t o open or close t he c over when directly beneath it. W hen removing bolts(3) , carry o ut the work from the rear of the cover so t hat you can easil y ge t out of the way. Refill capacity: 4 8 liters (12.68 U S gal) 1. Remove cover (1) at t he botto m rear of the 2. Loosen drain p lug (P) (with slit ) and d rain the oil.

Afte r draining t he oil, t ighten dr ain plu g (P). 3. Remove the un dercover bod y as follows 1) Remove 2 bolts (2 ) from the front s ide of th e machin e body. 2) Holding the cover , remove 2 bolts (3) from th e rear side of the m achine