Prepare - 42 SK1050 Operator’s Manual Gather Information Gather Information A successful job begins before you start working. The first step in planning is reviewing information already available about the job and jobsite. All Jobs Review Job Plan Review blueprints or other plans. Check for information about existing or planned structures, elevations, or proposed work that may be taking place at the same time. Arrange for Traffic Control If working near a road or other traffic area, contact local authorities about safety procedures and regulations. Plan for Emergency Services Have the telephone numbers for local emergency and medical facilities on hand.
Check that you will have access to a telephone. Ground-Penetrating Jobs Notify One-Call Services Mark proposed path or excavation area with white paint and have underground utilities located before working. In the US or Canada, call 811 (US) or 888-258-0808 (US and Canada). Also contact any local utilities that do not participate in the One-Call service. In countries that do not have a One-Call service, contact all local utility companies to have underground utilities located. Above-Ground Jobs Locate Overhead Lines Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load cannot touch lines.