11. EXPLANATION OF COMPONENTS 6. BLADE CONTROL LEVER (For machines with dual tilt and pitch mechanism) This carries out the blade lift, dual tilt, and pitch oper- ations. REMARK l Keep the button pressed and operate the lever to the or right, and the actuation of the dual tilt and pitch start. left will l The pitch circuit is the priority circuit, so if two buttons pressed at the same time, the pitch will be actuated. are Lifting control 0 RAISE ( fi ) 0 HOLD ( h ) Blade is stopped and held in this position. 0 LOWER ( & ) Raise t 1 Lower Dual tilting 8 RIGHT DUAL TILT ( 5~ ) G3 LEFT DUAL TILT ( l &II ) Right tilt l The dual tilt can be operated at any position from 0 to 0.
REMARK t l If the dual tilt button is not pressed, the normal tilt oper- ation is carried out. 4 Left tilt ilY Pitch control 0 Forward pitch (PITCH DUMP) ( ) REMARK The most suitable cutting angle for digging and rolling soil can be selected freely according to the type of soil and shape of the ground. This can be also used when dumping the load. L Rear pitch (PITCH BACK) ( x ) REMARK l The most suitable cutting angle for digging and rolling soil can be selected freely according to the type of soil and shape of the ground. l The pitch operation can be carried out at any position from 0 to 0. 2-l 9