12.11 EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER 12.11.1 DOZING WORK Dozing on level ground or downhill l Natural ground, bedrock F pitch \ S pitch (When load on blade becomes approx. 80%) R pitch F pitch 2. Hauling 3. Dumping $j A WARNING If you feel that the situation is dangerous when dump- ing the soil, for safety reasons, use two movements to push the soil over the edge. 1. Dig with the F (Forward) pitch, and when the load on the blade is approx. 80%, return to S (Straight) pitch and con- tinue digging. Set to R (Rear) pitch which gives a larger load, and haul the soil. Adjust the cutting angle to the most effective angle for rolling the soil. Use F pitch to dump the soil. 2. 3.