24. SERVICE PROCEDURE Adjust the flow of the water flowing in and draining out to ensure that the radiator is always full during the flushing operation. 10. When clean water comes out, stop the engine, drain all the water, then close drain valve @, drain valve @ and drain valve ®. 11. Add coolant, then fill with tap water until the water flows out from the water filler port. For details of the amount of coolant, see the water and coolant proportion table. A871 6660 12. To remove the air in the coolant, run the engine for 5 minutes at low idling, then run for a further 5 minutes at high idling. (When doing this, leave the water filler cap off.) FULL LOW 13.
Drain the water inside reserve tank ©, clean the inside of the reserve tank, then fill with cooling water to between the FULL and LOW lines. (Only EG125BS-2) p FULL LOW AD704580 14. Stop the engine, wait for 3 minutes, add tap water until the water level reaches near the water filler port, then tighten the cap. 25.2.3 CHECK ELECTRICAL AIR-INTAKE HEATER Carry out this check once a year before the cold weather starts. Remove electrical air intake heater @ from the engine manifold, and check for disconnections and dirt. When inspecting or installing the electrical intake replace the gasket with a new part. EG125B-2 intake air heater, AE726850 3-30