. OPERATION TRANSPORTATION LIFTING PROCEDURE 2. Stop the engine. CAUTION ground (raised 10 - 20 cm), stop and check carefully that the machine is 3 - 134 Lifting w ork can be carried out only w ith machines displaying a lifting mark. When pe rforming the lifting operation , stop the machine on fir m level ground, an 1. Start the engine, set the dump leve r to the FLOAT position, and chec k that the body pilot lamp go es out. 3. Set t he parking brake switch to th e PARKING position to apply the oper parking that the area around the the suffer inju ry to your hands if you carry ou t the operation with bare hands. 4.
Use wire rope, slings, and spread er bars to match the weight of th e machine, and fit the wire ro pe to the lifting points. REMARK The liftin g positions for the machine d iffers according to the conditions. Machine with body: Positions (1) and (3) at front, 2 at rear) nd (2) s (2 at front, 2 at rear) Total: 4 places (2 Machine without body: Positions (1) a Total: 4 place 5. Fit p rotector blocks at the contact points between the lifting equipment and th e body to preve nt damage t o the King equipment. 6. Whe n the machine comes off th bala nced and that the wire rope i 7. Rais e the machine slowly, then lo wer it to the target point.