Komatsu — Digging

OPERATION 3. Raise the lift arm slightly and increase the driving force of the front wheels. When doing this, do not push the bucket in too far. Remark When digging up large rocks, in some cases it may be better not to raise the lift arm too high. If the lift arm is raised too high, the rear wheels may come off the ground. 4. After loading the rock completely into the bucket, operate the bucket tilt and lift two to three times repeatedly to fill the bucket. 5. Let back the accelerator pedal; operate the control levers slowly; and tilt the bucket back fully. 6.

To prevent the load from falling out of the bucket, after completing the scooping-up operation operate in the dump and tilt direction when the bucket is near the full tilt in order to stabilize the load. Remark If the brakes are operated lightly before traveling in reverse, it is possible to stabilize the load in the bucket. To prevent generation of heat in the torque converter, keep the standard time for digging to within 10 seconds from the start of pushing the bucket in to the completion of scooping up. 2-128 WA380-6