MAINTENANCE Every 4000 Hours Service Maintenance for every 50, 100, 250, 500, 1,000, and 2,000 hours service should be performed at the same time. Lubricating Carry out the greasing once every two years, regardless of whether the 4,000 hour interval has passed. 1. Using a grease pump, apply grease through the grease fittings marked by arrows in the graphics. All views are from the rear of the machine. 2. After greasing, wipe off any old grease that was pushed out. 3. When lubricating, stop the drive shaft so that the grease fitting of center drive shaft spline (1) is as shown in the figure and supply grease from under the machine.
At this time, the grease fitting is at the position indicated by the arrow at the circle below, seen from the rear of the machine. (1) Center drive shaft spline (1 place) (2) Front drive shaft (2 places) 3-78 WA380-6