Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

EPA07 MBE 4000 SERVICE MANUAL Cylinder Block, 1-21 Installation, 1-38 Preparation, 1-35 Removal, 1-21 Inspection, 1-25 Measurement, 1-26, 1-28 Testing, 1-31, 1-33 Cylinder Head, 1-8 Installation, 1-15 Removal, 1-8 Inspection, 1-11 Machining, 1-13 Testing, 1-14 Cylinder Head Cover, 1-6 Installation, 1-6 Removal, 1-6 D Doser Block Assembly, 2-68 Installation, 2-69 Removal, 2-68 Drive Belts, 9-3 Installation, 9-5, 9-7, 9-10–9-11 Removal, 9-4, 9-6, 9-9–9-10 E EGR Control Valve, 8-23 Installation, 8-23 Removal, 8-23 EGR Cooler and Support Bracket, 8-9 Installation, 8-13, 8-17 Removal, 8-9, 8-17 Testing, 8-12 EGR Cooler Coolant Inlet Tube, 8-19 Installation, 8-20 Removal, 8-19 EGR Cooler Coolant Return Tube, 8-21 All information subject to change without notice.

DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION Index-3